With the completion of the main portion of our campus remodel and expansion, smaller and finishing-touch projects are still underway.

Projects Underway:

  • West dirt pile. New parking spots will be extended west from the existing parking by the ECC. The ground will be shaped for irrigation installation in preparation for landscape plantings.
  • Installing labels on pipes, valves and equipment in the church building. 

Property Team Members:

Pastor Steve Wolcott 
Daryl Schilperoort (Chairman)
Bill Schmidt
Brian Guernsey
Jason Tucker
Mark Christianson
Shane Cox

New members for this team are being recruited. If you are interested in finding out more, please contact Daryl.

PROPERTY TEAM MISSION STATEMENT: 

To glorify God with a church campus that presents a positive image and supports the ministries of the church by maintaining, repairing and upgrading the church property.

"Whatever you do, work at it with all your heart, as working for the Lord, not for men." Colossians 3:23

Recent Accomplishments:

  1. Northwest property yard sale
  2. Northwest property Overhead Door installation
  3. Main entry canopy columns replacement
  4. Concrete pads by ECC and Senior Ministry Room doors
  5. Rock wall and fence on east side Adult Ministry Center
  6. Irrigation installation
  7. Grass sod placed and hydroseeding done

The work day on April 4 made a huge dent in Areas Needing Attention:

Trenches and holes on the Northwest corner of the Adult Ministry Center was backfilled.

Junipers along Summitview Ave were trimmed and cleaned up and the west bushes at the top of the driveway were removed. Suckers were trimmed from the Sycamore trees.

The Oasis received some TLC with weeding along the fence line, between sidewalk and asphalt and around the building itself. New bark was also spread, as well as a coating of Caseron in cracks on the sidewalk. 

Excess old bark was removed and replaced with new bark in front of the offices. Bare ground on the east, north and northwest sides of the main building were cleaned up and then covered in bark. 

Thank you to the more than 20 volunteers who arrived on Saturday, April 4 to make all of this beautification process a reality.

Your ideas, comments and suggestions on property topics are welcomed and encouraged. Click here to let us know how we can do a better job!